b'Centurion Pipe Bending Machine 22-36Pipe Bending Data [Metric]NominalPipe OD Maximum Wall Thickness by Grade Recommended Bendmm X52 X60 X65 X70 X80x100 Degree Arc Radius Max degree per (per meter) (meters) 12 meter joint559 - - - - 2.60 21.95 22.28610 - - - - 2.50 23.16 21.11660 - - - - -43.34 2.30 24.99 19.56711 - - - - 46.7136.97 2.10 26.82 18.23762 - - 50.08 46.33 40.2931.94 2.00 28.96 16.89813 - 47.42 43.61 40.36 35.1327.89 1.90 29.87 16.37864 48.38 41.66 38.33 35.50 30.9224.57 1.80 31.70 15.43914 42.83 36.92 33.98 31.48 27.4421.83 1.60 35.05 13.95 559mm - 914mm (CENTURION) PIPE BENDING DATA - ALL DIMENSIONS IN MILLIMETERS Based on 85% efficiency and maximum strength.Pipe Bending Data [Imperial]NominalPipe OD Maximum Wall Thickness by Grade Recommended Bendinch X52 X60 X65 X70 X80x100 Degree Arc Radius Max degree per (per foot) (feet) 40 foot joint22 - - - - 0.80 72.00 22.2824 - - - - 0.75 76.00 21.1126 - - - - -1.706 0.70 82.00 19.5628 - - - - 1.8391.456 0.65 88.00 18.2330 - - 1.972 1.824 1.5861.257 0.60 95.00 16.8932 - 1.867 1.717 1.589 1.3831.098 0.58 98.00 16.3734 1.905 1.640 1.509 1.398 1.2170.967 0.55 104.00 15.4336 1.686 1.453 1.338 1.239 1.0800.859 0.50 115.00 13.95 22- 36(CENTURION) PIPE BENDING DATA - ALL DIMENSIONS IN INCHES Based on 85% efficiency and maximum strength.Notes Bending Tables: A cell marked with a dash [-] represents the ability toSkill of the operator handling the bendingbend up to 2.00 inch thick. For Wall thickness greater machine and mandrel.than shown, please contact CRC-Evans.Origin of pipe (pipe mill, plate mill, etc.) andquality of pipe. Figures are recommendations only and do notType of pipe. Spiral seam pipe will normallyconstitute a warranty. accept only 75% of recommended bend. All bends shown include the use of CRC-EvansType of die and/or bending set being used bending mandrels. Figures given are average and (e.g., polyurethane lining or special radius dies).will vary due to:An unbent end (tangent) is produced at each The wall thickness of the pipe. end of the pipe where the pipe contacts the stiff Actual (as opposed to nominal) yield of the back. Normal unbend tangent for PB 22-36 is 6pipe. feet.13'